  • Calculate work centre overloads and scheduled delivery dates
  • Graphically display forward work centre loading
  • Drag and drop movement of jobs
  • Graphic work-to list dynamically updated from shop floor returns

  • The scheduling module allows Works Orders to be loaded into the capacity plan and moved by drag and drop to permit easy maintenance of the plan.

    The scheduling module is fully integrated with Prodman Works Order Processing and Shop Floor Data Capture.

    Once the schedule has been agreed the system will update the rest of Prodman including the start and finish time of each operation and the scheduled finish date of the job.

  • The system will allow scheduling of single job or a batch of jobs as required
  • The colour coding makes it easy to view the jobs
  • Parameters allow for finite or infinite capacity loading
  • Only schedule the Work Centres you need to schedule - non critical Work Centres need not be scheduled
  • A calendar is used to set to standard work pattern.

    Graphically display the overall loading of the work centre for a given time range